top of page

ENGINEERING

Red Hook Wastewater Resource Recovery Facility

Owner: NYC DEP

Client: STV, Inc.

Location: Brooklyn, NY

Projected Completion Year: 2025

As a subcontractor to STV Inc., Macan Deve is providing permitting support, MOPO/MOFO support and mechanical, plumbing and architectural support during design and construction for the installation of flood adaptation strategies to harden and enhance the resiliency of the Red Hook WWTP and reduce the probability of damage, service disruptions, and environmental impacts during and after a storm surge event. Design services include development of architectural, mechanical and plumbing drawings and specifications and PDC submissions coordination. Project services additionally include procurement support, review and response of architectural, mechanical, plumbing and MOPO/MOFO shop drawings and RFIs, and PDC closeout. Flood adaptation strategies to be completed as part of the Storm Mitigation Loan Program grant funding include sealing and structurally reinforcing building perimeters and flood pathways to the tunnel system to protect critical equipment; providing perimeter flood wall protection at the Electrical Substation; providing secondary egress; installing backflow prevention on floor and sanitary drains; installing sanitary riser on building drain vents; raising and replacing sump, seal water, service water and grit suspension pumps. 

bottom of page